Texas
HB905
HB905 - Relating to the imposition of tolls on Fairmont Parkway in Harris County.
Source: Congress.gov ·
382 words in original text
Plain English summary not yet available
The full original text is available below. Check back soon as we process this bill.
  89R1017 CMO-D     By: Cain H.B. No. 905       A BILL TO BE ENTITLED   AN ACT   relating to the imposition of tolls on Fairmont Parkway in Harris   County.          BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:          SECTION 1.  Section 228.011(a), Transportation Code, is   amended to read as follows:          (a)  This section applies only to a county acting under   Chapter 284 for:                (1)  the widening, expansion, reconstruction, and   continued operation of existing toll projects of the county; or                (2)  the development, construction, and operation of   all or a portion of any of the following toll projects, a component   of that project, or the functional equivalent of that project:                      (A)  Beltway 8 Tollway East, between US 59 North   and US 90 East;                      (B)  Hardy Downtown Connector, consisting of the   proposed direct connection from the Hardy Toll Road southern   terminus at Loop 610 to downtown Houston;                      (C)  State Highway 288, between US 59 and Grand   Parkway South (State Highway 99);                      (D)  US 290 Toll Lanes, between IH 610 West and the   Grand Parkway Northwest (State Highway 99);                      (E)  [ Fairmont Parkway East, between Beltway 8   East and Grand Parkway East (State Highway 99);                      [ (F) ]  South Post Oak Road Extension, between IH   610 South and near the intersection of Beltway 8 and Hillcroft in   the vicinity of the Fort Bend Parkway Tollway;                       (F)  [ (G) ]  Westpark Toll Road Phase II, between   Grand Parkway (State Highway 99) and FM 1463;                       (G)  [ (H) ]  Fort Bend Parkway, between State   Highway 6 and the Brazos River; and                       (H)  [ (I) ]  Montgomery County Parkway, between   State Highway 242 and the Grand Parkway (State Highway 99), and if   the Grand Parkway project has not begun construction, a nontolled   extension of the Montgomery County Parkway to allow a connection to   Interstate Highway 45.          SECTION 2.  Subchapter B, Chapter 372, Transportation Code,   is amended by adding Section 372.060 to read as follows:           Sec.   372.060.     FAIRMONT PARKWAY. A toll project entity may   not impose a toll on any portion of Fairmont Parkway in Harris   County.          SECTION 3.  This Act takes effect September 1, 2025.
Important: This plain English summary was generated by AI and is provided for informational purposes only.
It is not legal advice. Always consult the official bill text on Congress.gov
or a qualified attorney for legal matters.